Brazeau County advises residents and motorists that concrete sampling and testing work is scheduled on the Brazeau Spillway Bridge on Sunchild Road (Highway 620) from July 6 to July 8, weather and site conditions permitting.
During this work, traffic on the bridge will be reduced to a single lane, and motorists should expect minor delays. Traffic control personnel and signage will be in place to safely direct traffic through the work zone. Drivers are asked to slow down, follow all posted signage, and use caution when travelling through the area.
We appreciate your patience and cooperation while this work is completed.